CATEGORY/DESIGNATION Construction Foreman 1.80 523.80 Leadman 1.65 480.15 Heavy

CATEGORY/DESIGNATION Construction Foreman 1.80 523.80 Leadman 1.65 480.15 Heavy Equipment Operator 1.50 436.50 High Skilled Laborer 1.50 436.50 Light Equipment Operator 1.40 407.40 Driver 1.30 378.30 Skilled Laborer 1.30 378.30 Unskilled Laborer 1.00 291.00 Note: Lanao del Norte (except Iligan) Minimum Daily Wage = 291.00 LABOR COST INDEX BASIC DAIL Y WAGE LEAVE PHIL-HEAL TH 13,706.10 1,142.18 1,142.18 994.50 162.50 12,563.93 1,047.00 1,047.00 920.80 150.00 11,421.75 951.82 951.82 847.20 137.50 11,421.75 951.82 951.82 847.20 137.50 10,660.30 888.36 888.36 773.50 125.00 9,898.85 824.91 824.91 736.70 112.50 9,898.85 824.91 824.91 736.70 112.50 7,614.50 634.55 634.55 552.50 87.50 BASIC MONTHL Y WAGE THIRTEENTH MONTH PAY/BONUS BENEFITS (SSS) PAG-IBIG ECC 100.00 10.00 17,257.46 659.53 82.45 100.00 10.00 15,838.73 605.31 75.67 100.00 10.00 14,420.09 551.09 68.89 100.00 10.00 14,420.09 551.09 68.89 100.00 10.00 13,445.52 513.85 64.24 100.00 10.00 12,507.87 478.01 59.76 100.00 10.00 12,507.87 478.01 59.76 100.00 10.00 9,633.60 368.17 46.03 TOTAL RATE/MONTH RATE PER DAY RATE PER HOUR EQUIPMENT Motor Grader Vibratory Roller Concrete Mixer (1-bagger) Concrete Vibrator Water Pump, 3" dia. (1500lpm) Bar Shear, 42 mm Bar Bender Generator Set (51-100kW) Generator Set (251-300kW) Concrete Batch Plant (10 cu.m./hr.) Plate Compactor Dump T ruck(10 cu.m.) Water T ruck, 500-1000 gals. Excavator, 1.0 cu.m. Bulldozer T ransit Mixer (5 cu.m.) Payloader (3.0 cu.m.) Excavator, 1.0 cu.m. Welding Machine, 300 Amp DIESEL 35.00 BRAND/MODEL FL YWHEEL/HP XCMG GR135 135 230,087.00 LONKING CDM510B 125 263,856.00 22 22,308.00 5 13,125.00 6.7 22,365.00 10 42,187.00 10 55,687.00 40 33,374.00 50 96,986.00 180 222,160.00 13.5 54,900.00 Isuzu Fuso 275 156,624.00 Isuzu Giga 360 138,424.00 Volvo EC210 118 290,290.00 Shiantui SD22 218 504,790.00 Isuzu Fuso 195 191,724.00 Caterpillar 950H 180 540,397.00 Komatsu PC200 148 545,173.20 48 48,191.00 BARE MONTHL Y RENTAL GASOLINE 43.00 FUEL LABOR FUEL 1,150.44 138.05 715.37 14.18 68.89 1,319.28 158.31 662.38 13.13 68.89 111.54 13.38 116.58 64.24 65.63 7.88 26.50 64.24 111.83 13.42 35.50 0.70 64.24 210.94 25.31 64.24 278.44 33.41 64.24 166.87 20.02 211.96 4.20 484.93 58.19 264.95 5.25 1,110.80 133.30 82.45 274.50 32.94 71.54 1.42 64.24 783.12 93.97 1,457.23 28.88 59.76 692.12 83.05 1,907.64 37.80 59.76 1,451.45 174.17 625.28 12.39 68.89 2,523.95 302.87 1,155.18 22.89 68.89 958.62 115.03 1,033.31 20.48 59.76 2,701.99 324.24 953.82 18.90 68.89 2,725.87 327.10 784.25 15.54 68.89 240.96 28.91 BARE MONTH RATE REPAIR AND MAINTENANCE (12%) OIL AND LUBRICANTS VAT (9%) RENTAL COST/HR 80.53 2,167.45 92.35 2,314.33 7.81 313.55 4.59 168.83 7.83 233.52 14.77 315.25 19.49 395.58 11.68 414.74 33.95 847.27 77.76 1,404.30 19.22 463.85 54.82 2,477.77 48.45 2,828.82 101.60 2,433.79 176.68 4,250.46 67.10 2,254.30 189.14 4,256.97 190.81 4,112.46 16.87 286.74 EQUIPMENT HAULING DISTANCE uploads/Ingenierie_Lourd/ estimation-guide.pdf

  • 33
  • 0
  • 0
Afficher les détails des licences
Licence et utilisation
Gratuit pour un usage personnel Attribution requise
Partager