E4416 programming guide Programming Guide Agilent Technologies EPM-P Series Power Meters Agilent Technologies Part no E - Fourth Edition March C ? Copyright ?? Agilent Technologies All rights reserved Reproduction adaptation or translation without prior w

Programming Guide Agilent Technologies EPM-P Series Power Meters Agilent Technologies Part no E - Fourth Edition March C ? Copyright ?? Agilent Technologies All rights reserved Reproduction adaptation or translation without prior written permission is prohibited except as allowed under the copyright laws Printed in Malaysia ii EPM-P Series Power Meters Programming Guide CEquipment Operation WARNING Caution WARNING Equipment Operation Warnings and Cautions This guide uses warnings and cautions to denote hazards A warning calls attention to a procedure practice or the like which if not correctly performed or adhered to could result in injury or the loss of life Do not proceed beyond a warning until the indicated conditions are fully understood and met A caution calls attention to a procedure practice or the like which if not correctly performed or adhered to could result in damage to or the destruction of part or all of the equipment Do not proceed beyond a caution until the indicated conditions are fully understood and met Personal Safety Considerations This is a Safety Class I product provided with a protective earthing ground incorporated in the power cord The mains plug shall only be inserted in a socket outlet provided with a protective earth contact Any interruption of the protective conductor inside or outside the instrument is likely to make the instrument dangerous Intentional interruption is prohibited If this instrument is not used as speci ?ed the protection provided by the equipment could be impaired This instrument must be used in a normal condition in which all means of protection are intact only No operator serviceable parts inside Refer servicing to quali ?ed personnel To prevent electrical shock do not remove covers For continued protection against ?re hazard replace the line fuse s only with fuses of the same type and rating for example normal blow time delay etc The use of other fuses or material is prohibited EPM-P Series Power Meters Programming Guide iii CGeneral Safety Considerations WARNING Caution General Safety Considerations Before this instrument is switched on make sure it has been properly grounded through the protective conductor of the ac power cable to a socket outlet provided with protective earth contact Any interruption of the protective grounding conductor inside or outside the instrument or disconnection of the protective earth terminal can result in personal injury Any adjustments or service procedures that require operation of the instrument with protective covers removed should be performed only by trained service personnel User Environment The product is suitable for indoor use only iv EPM-P Series Power Meters Programming Guide CAbout this Guide About this Guide Chapter Power Meter Remote Operation This chapter describes the parameters which con ?gure the power meter and helps you determine settings to optimize performance Chapter MEASurement Instructions This chapter explains how to use the MEASure group of instructions to acquire data using a set of high level instructions Chapter CALCulate Subsystem This chapter explains how to use the CALCulate subsystem to perform post acquisition data processing Chapter CALibration Subsystem

Documents similaires
EKOLOGIE – přednášky Studijní literatura BEGON, M. – HARPER, J. – TOWNSEND, C.: 0 0
Guide pratique 2020 2021 web 0 0 0
uploads/s1/ devoir-cp.pdf 0 0
Office guide 1 Mini-guide créé par Lydia Provin du site http www votreassistante net Page CMini-guide O ?ce et Adobe Avant-propos Ce livre est sous licence Creative Common Paternité - pas de modi ?cation Cela signi ?e que vous êtes libre de le distribuer 0 0
Chapitre 4xml B Chapitre XML et Base des données I Historique de SGML à XML XML dérive d'un langage développé dans les années le SGML Ce langage était complexe à apprendre et utiliser quotidiennement Une version allégée le HTML a donc été développée mais 0 0
uploads/s1/ es-ses-obligatoire-2015-asie-corrige-officiel.pdf 0 0
Extrait dalfc1 c2 n D p F - répa r atio CERTIFICATION Français Langue Étrangère ELF-DAL C C Le DALF réussite Pl ? reêxtapmoeunr DDe é exe Cpsps rD ?leci cqouahurvuareéediussgsitocéDhosmeAnnLpsteF iqilus e p F n D LF-D répa r atio CERTIFICATION Français La 0 0
Reparti do 1 Faire un exposé oral à partir de documents écrits Qu'est-ce qu'on me demande de faire L'Exposé oral consiste à transmettre devant un public ou un jury un compte-rendu synthétique construit et convaincant contenant des informations fournies pa 0 0
Xxxxx XXXX 51 rue xxxxxxx 0000 Xxxxx 19 ans - Célibataire Téléphone: 000000000 0 0
C1 jpf exemple JE PARLE FRANÇAIS - Niveau DALF C EXEMPLE DIPLÔMES - CECRL EDITIONS T TEGOS www editionstegos com CSOMMAIRE Avant-propos p PREMIÈRE PARTIE Compréhension des écrits et Production écrite p Consignes pour réussir la partie écrite p Dossier N C 0 0
  • 68
  • 0
  • 0
Afficher les détails des licences
Licence et utilisation
Gratuit pour un usage personnel Attribution requise
Partager
  • Détails
  • Publié le Jui 09, 2022
  • Catégorie Administration
  • Langue French
  • Taille du fichier 1MB